Expanding an Existing Industrial Facility

Industrial | Architect | Planning

Industrial Architects

Before

Scroxton & Partners were commissioned to design two new extensions to a an existing facility.

The side extension is a new storage facility to house glass spice bottles on the ground floor and plastic containers on the first floor, with a lift and staircase that connects the two floors.

The ground floor is designed to allow a forklift truck access and there will be a loading bay to allow direct access from the yard. The rear extension will be a covered loading area for articulated lorries. The extension should be large enough to house two lorries and have access to one side of the trucks for loading and unloading. The distance between the trucks will be large enough for a forklift trucks turning circle.

Get in touch

After

This new expanded facility should be a pleasure for both staff and visitors alike, with functional organisation of spaces sitting at the heart of high-quality working environments and visually pleasing structures and spaces.

Contact Us

Contact

To find out more about the services that we offer and what it is like to work with us on your project, please call on 01933 698 001 or click on the button below to start a conversation.

If you would like to join our team, please click here to find out more

Get in touch